top of page
Search

Airport NoC | Air force NoC for Construction

Updated: Sep 3, 2023

No  Objection  Certificate  from  MOD 

For more details please call on +91-9422033119


 As per Govt. of India’s Gazette no  GSR-751(E) dated 30.09.2015 ,

NoC from Ministry of Defense (MOD) for building permission in residential areas of Pune Municipal  Corporation, Pimpri- Chinchwad  Municipal Corporation, PMRDA is mandatory.


As per above gazette, NoC is compulsory for new structure/Alternation/Revised Building plan Approval/ At   Plinth Level  Checking  or  Completion stage.


For submission of NoC proposal to Ministry of Defence (Indian Air Force Authority), following documents are necessary.

  1. Ground level of plot under consideration certified from authorised survey agency and countersigned by concerned   local  administration  authority.

  2. Building Plan submission certificate from concerned local authority.

  3. NoC Proposal in prescribed formats  with required documents are mandatory submitted to  MOD(Indian Air Force Authority)

In general to get NoC from MOD (Indian Air Force Authority), minimum 4-5 months period is necessary. At Smart Infra Consultants you get a proper guidance for all the processes and assistance in getting your NoC Certificate from the Authorities.


The Best part is, the process is done in most Ethical manner and so there is no extra cost that you have to sustain on.


For getting any of your NoC get Connected Today.


463 views0 comments
bottom of page